leppington · riparian corridor
Emerald Hills — Stage 2 Riparian Corridor
Client Macarthur Developments
Environmental restoration along the natural waterway — riparian revegetation, erosion control and habitat improvement — creating a resilient ecological corridor that lifts biodiversity and water quality as the surrounding community grows.
oran park · corridor & basin
Ron's Creek — Stage 2 Corridor & Detention Basin
Client Greenfields Development Company
Landscape Architect JMDdesign
An integrated corridor linking the previously restored Ron's Creek basin and waterway to a newly revegetated creekline. Riparian rehabilitation, revegetation and stormwater works improve water quality, flood resilience and native habitat — strengthening ecological connectivity for the growing community.
oran park · environmental corridor
Tr41/22 — Environmental Corridor
Client Greenfields Development Company
Landscape Architect JMDdesign
Revegetation and landscape works enhancing stormwater management and biodiversity — drainage infrastructure, earthworks, revegetation and shared pathways woven into connected green space that supports sustainable urban growth.
oran park · riparian & basin
Tr22 — Stage 2 Riparian & Basin
Client Greenfields Development Company
Landscape Architect JMDdesign
Integrated civil and environmental works — riparian restoration, basin construction, erosion control and revegetation — building a resilient environmental asset that benefits both the surrounding ecosystem and the future community.
leppington · detention basin
Emerald Hills — Stage 11 Detention Basin
Client Macarthur Developments
Native revegetation to stabilise the basin, lift biodiversity and improve water quality — a resilient landscape that complements the surrounding community and its stormwater infrastructure.